Coachella Valley Water District
- Section 8 - Design Criteria Stormwater Facilities
- CVWD Stormwater Service Area Map
- Appendix K-1. Report Format/Content Requirements - Projects Adjacent to CVWD Stormwater Facilities
- Appendix K-2. Slope Protection Design
- Appendix K-3. Scour Calculation Guidance
- Appendix K-4. Storm Drain Outlets Design Guidance
- Appendix K-5. Report Format/Content Requirements - Stormwater Service Area
- Appendix K-6. Framework for Hydrologic Modeling
- Appendix K-7. Ordinance 1234.2
- Arneson, L.A., L.W. Zevenbergen, P.F. Lagasse, and P.E. Clopper, 2012. Evaluating Scour at Bridges, 5th Edition, HEC-18, prepared for Federal Highway Administration, April.
- Blench, T, 1969. Mobile-bed Fluviology, University of Alberta.
- Bormann, N.E. and P.Y. Julien, 1991. Scour Downstream of Grade-Control Structures, Journal of Hydraulic Engineering, American Society of Civil Engineers, 117(5): 579-594.
- Breusers, H.N.C. and A.J. Raudkivi, 1991. Scouring, Hydraulic Structures Design Manual No. 2: Hydraulic Design Considerations, A.A. Balkema, Rotterdam.
- D'Agostino, V. and V. Ferro, 2004. Scour on Alluvial Bed Downstream of Grade-Control Structures, Journal of Hydraulic Engineering, American Society of Civil Engineers, 130(1): 24-37.
- Fischenich, C, 2001. Stability thresholds for stream restoration materials, TN-EMRRP-SR-29, Research and Development Center, U.S. Army Corps of Engineers, Vicksburg, MS.
- May, R.W.P., J.C. Ackers, and A.M. Kirby, 2002. Manual on scour at bridges and other hydraulic structures, CIRIA, London.
- Maynord, S.T., 1996. Toe-scour estimation in stabilized bendways, Journal of Hydraulic Engineering, American Society of Civil Engineers, 121(8): 460-464.
- Melville, B.W. and S.E. Coleman, 2000. Bridge Scour. Water Resources Publications, Colorado.
- Neill, C.R. (Ed.), 1973. Guide to Bridge Hydaulics, Roads and Transportation Association of Canada, University of Toronto Press.
- NHC, 2011. Grade Control Structures for the Coachella Valley Stormwater Channel (Draft) Discussion of Policy, Memorandum from Northwest Hydraulic Consultants (NHC) to Coachella Valley Water District, March 15.
- Pemberton, E.L. and J.M. Lara, 1984. Computing Degradation and Local Scour, Engineering and Research Center, Bureau of Reclamation, U.S. Department of the Interior, January.
- TAC, 2004. Guide to Bridge Hydaulics, 2nd Edition, Transportation Association of Canada, Thomas Telford, London.
- USACE, 1994a. Channel Stability Assessment for Flood Control Projects, EM 1110-2-1418, U.S. Army Corps of Engineers (USACE).
- USACE, 1994b. Hydraulic Design of Flood Control Channels, EM 1110-2-1601, U.S. Army Corps of Engineers (USACE).
- USACE, 1980. Whitewater River Basin Feasibility Report For Flood Control and Allied Purposes, San Bernardino and Riverside Counties, California, Appendix I - Hydrology, Los Angeles District, U.S. Army Corps of Engineering (USACE), May.
- Bechtel, 1991. Flood Studies for East and West Dikes in Coachella Valley Area, prepared for Coachella Valley Water District, October.
- BOR, 1966. Guadalupe Creek Diversion Dikes Plan and Profile Drawings, Coachella Valley County Water District R. & B., All-American Canal System - California, Boulder Canyon Project, Bureau of Reclamation (BOR), U.S. Department of the Interior, January 14.
- BOR, 1947. Coachella Valley Flood Protection Wasteways Nos. 2 and 3 Drawings, All-American Canal System - California, Boulder Canyon Project, Bureau of Reclamation (BOR), U.S. Department of the Interior, September 3.
- BOR, 1947. A Report on the Engineering Feasibility, The Total Cost, and The Allocation and Probable Repayment of These Costs of the Distribution System and Flood Control Works, Coachella Valley Division, All-American Canal Project, Bureau of Reclamation (BOR), U.S. Department of the Interior, April.
- DWR, 1964. Coachella Valley Investigation, Bulletin No. 108, Department of Water Resources (DWR), California, July.
- NHC, 2014. North Cathedral City and Thousand Palms Stormwater Management Plan, Morongo Wash Watershed Hydrology and Hydraulics, Northwest Hydraulic Consultants (NHC), prepared for Coachella Valley Water District, April 25.
- NHC, 2014. North Indio Study Area Stormwater Management Plan, East Side Dike and North Indio Hydrology and Hydraulics, Northwest Hydraulic Consultants (NHC), prepared for Coachella Valley Water District, April 21.
- PACE, 2005. FEMA Application for Physical Map Revision, The Enclave at La Quinta, prepared for The Enclave at La Quinta, LLC, April.
- Pyke, C.B., 1975. The Indio, California Thunderstorm of 24 September 1939, American Geophysical Union National Symposium on Precipitation Analysis for Hydrologic Modeling, Davis, California, June 26-28.
- Slater, W.R., H.G. Curtis, and P.A. Oliver, 1950. Flood Control Works All-American Canal, Coachella Branch, Boulder Canyon Project, Joint Summer Convention of the American Society of Civil Engineers and the Engineering Institute of Canada, Toronto, Ontario, July.
- USACE, 1972. Indio Thunderstorm, 1939, Los Angeles District, U.S. Army Corps of Engineers (USACE), September.
Last updated 3/24/2018. Please report any missing links to: admin@Q3consulting.net